AT&T DEFINITY 7300 series Instrukcja Obsługi Strona 106

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 438
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 105
INSTALLATION
8.
9.
10.
11.
12.
13.
Connect a 25-pair plug on octopus cable to the SIP receptacle on
the ETU.
Mount the octopus cable on the 50A Fanning Strip (Figure 2-31).
Connect all eight legs of the octopus cable to adapters (port side) at
the SIP. The first five stations (legs 1 through 5) are the Power
Failure Transfer stations.
Document the connections on the Voice and Data Station Record
Form (Figure 2-26).
Connect ETUs (Optional)
For systems having three or four ETUs connect ETU 1 to ETU 3
using a D8W-87 cord. Plug one end into the modular jack labeled
ADDITIONAL ETU on ETU 1 and the other end into the modular jack
labeled SWITCH (cpu) on ETU 3. Connect ETUs2 and 4 the same
way.
Connect External Alarm (Optional)
Connect the external alarm (if required) to the two screw
terminations labeled EXTERNAL ALARM on the upper right of the
ETU.
2-81
Przeglądanie stron 105
1 2 ... 101 102 103 104 105 106 107 108 109 110 111 ... 437 438

Komentarze do niniejszej Instrukcji

Brak uwag