AT&T DEFINITY 7300 series Instrukcja Obsługi Strona 83

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 438
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 82
INSTALLATION
Consideration should be given to installing secondary protection on each
out-of-building facility connected to the TAE if any of the following conditions
exist:
The service entrance (protector block) ground is not properly
installed (bonded to building ground, for example).
The local telephone company does not permit access to the
protector block.
High-voltage surge protection is not provided.
Install the CBC as follows:
1.
Connect one end of the CBC to the ground point at the network
interface.
2. Wrap the CBC loosely around the cable from the network interface
to the TAE and then around a splitter cable to the cabinet. If
possible, tie wrap the CBC to the cables.
3. Connect the end of the CBC to the ground block on Cabinet 1. See
Figure 2-13.
2-59
Przeglądanie stron 82
1 2 ... 78 79 80 81 82 83 84 85 86 87 88 ... 437 438

Komentarze do niniejszej Instrukcji

Brak uwag